Installation of 192 Units of 12KVA/150AR RITAR Batteries at Galaxy Backbone, Abuja
Client: Galaxy Backbone
Executed By: First Material & Engineering Ltd (FME)
Location: Abuja, FCT
Category: Power Infrastructure, Data Center Backup Systems & Electrical Installation
Project Overview
First Material & Engineering Ltd (FME) was commissioned to supply and install 192 units of 12KVA/150AR RITAR batteries to power a 345.64KWatt Data Center at Galaxy Backbone, Abuja. The project aimed to ensure uninterrupted power supply, enhance operational reliability, and provide robust energy backup for critical IT infrastructure.
Scope of Work
1. Battery Supply & Verification
Procurement of high-capacity 12KVA/150AR RITAR batteries
Inspection and verification of battery specifications to meet data center load requirements
Delivery to site with secure handling procedures
2. Installation & Integration
Positioning and racking of 192 battery units within designated battery rooms
Electrical integration with existing power backup systems
Installation of monitoring systems and safety devices for load management
3. Testing & Commissioning
Comprehensive testing of batteries for performance, voltage, and capacity
Load testing to ensure full compatibility with the 345.64KWatt data center requirements
Commissioning and handover to the client with operational documentation
4. Safety & Compliance
Strict adherence to electrical safety standards and data center requirements
Provision of protective systems to prevent short circuits, overload, or thermal issues
Implementation of proper ventilation and battery room environmental controls
Project Delivery
FME executed the project with precision, ensuring all batteries were installed, connected, and tested for optimal performance. The work was completed on schedule, with minimal disruption to ongoing data center operations.
Impact & Value
The battery installation project significantly strengthened Galaxy Backbone’s data center power resilience. Key benefits include:
Reliable uninterrupted power supply for critical IT infrastructure
Enhanced operational continuity and disaster recovery capability
Reduced risk of downtime and data loss
Long-term performance with minimal maintenance
Conclusion
This project demonstrates First Material & Engineering Ltd’s expertise in delivering high-capacity power backup solutions for mission-critical facilities. FME remains a trusted partner for data center and industrial clients requiring dependable electrical infrastructure solutions.