Installation of 192 Units of 12KVA/150AR RITAR Batteries at Galaxy Backbone, Abuja

Client: Galaxy Backbone
Executed By: First Material & Engineering Ltd (FME)
Location: Abuja, FCT
Category: Power Infrastructure, Data Center Backup Systems & Electrical Installation

Project Overview

First Material & Engineering Ltd (FME) was commissioned to supply and install 192 units of 12KVA/150AR RITAR batteries to power a 345.64KWatt Data Center at Galaxy Backbone, Abuja. The project aimed to ensure uninterrupted power supply, enhance operational reliability, and provide robust energy backup for critical IT infrastructure.

Scope of Work
1. Battery Supply & Verification

Procurement of high-capacity 12KVA/150AR RITAR batteries

Inspection and verification of battery specifications to meet data center load requirements

Delivery to site with secure handling procedures

2. Installation & Integration

Positioning and racking of 192 battery units within designated battery rooms

Electrical integration with existing power backup systems

Installation of monitoring systems and safety devices for load management

3. Testing & Commissioning

Comprehensive testing of batteries for performance, voltage, and capacity

Load testing to ensure full compatibility with the 345.64KWatt data center requirements

Commissioning and handover to the client with operational documentation

4. Safety & Compliance

Strict adherence to electrical safety standards and data center requirements

Provision of protective systems to prevent short circuits, overload, or thermal issues

Implementation of proper ventilation and battery room environmental controls

Project Delivery

FME executed the project with precision, ensuring all batteries were installed, connected, and tested for optimal performance. The work was completed on schedule, with minimal disruption to ongoing data center operations.

Impact & Value

The battery installation project significantly strengthened Galaxy Backbone’s data center power resilience. Key benefits include:

Reliable uninterrupted power supply for critical IT infrastructure

Enhanced operational continuity and disaster recovery capability

Reduced risk of downtime and data loss

Long-term performance with minimal maintenance

Conclusion

This project demonstrates First Material & Engineering Ltd’s expertise in delivering high-capacity power backup solutions for mission-critical facilities. FME remains a trusted partner for data center and industrial clients requiring dependable electrical infrastructure solutions.